Davie Homes With Solar Panels: Lease or Owned System?
Quick answer
Before you go under contract, find out whether the solar system is owned outright, owned with a loan, leased, or under a power purchase agreement. Each one transfers differently. Ask the seller for the contract, the payoff or transfer terms, the permit and interconnection approval, and ask title counsel about debtor-name UCC and county real-property searches.
Compare solar ownership economics before assuming the contract
Florida UCC Registry help explains filing and retrieval of security-interest documents. Let title counsel determine which searches and releases are needed.
Davie permit search check system approvals and roof attachments separately. For the ownership decision, compare the actual lease/PPA payment schedule, escalation, production promises, assignment conditions and removal obligations against an owned system’s costs. No generic savings, automatic conveyance or transfer approval is asserted.
Four ways a solar system can be held
| Type | Who owns the panels | What to ask |
|---|---|---|
| Owned (paid off) | Homeowner | Warranty transfer, permits, inverter age |
| Owned with loan | Homeowner, with a lien or filing | Payoff at closing? Any UCC filing? |
| Lease | Solar company | Transfer approval, monthly payment, buyout terms |
| PPA | Solar company | Rate per kWh, escalator, transfer process |
Documents to request
- Signed solar contract and any amendments
- Town building permit and final inspection
- Utility interconnection approval
- Panel, inverter and workmanship warranties
- Roof work done around the install
Roof and insurance questions
Ask how old the roof was when the panels went on and who pays to remove and reinstall them if the roof is replaced. Tell your insurance agent about the system early, since it can affect coverage.
Related Mora Realty Davie pages
Sources